Skip to content
BlogProduction

Footwear production: size runs, pairs and material consumption

Forty-eight correct pairs in total can still be the wrong size run when variants do not match.

Size run, pairs and net material use

Ten tests of variant mix, weighted use, revision, partial delivery and unduplicated pairs.

Download CSV worksheet
In this guide

What identifies the size run you must deliver?

Relate order, model, color, sizing system and pair quantity by variant. Numbering needs a catalog: do not assume equivalence between different systems' labels. Distinguish pair, individual shoe, component and box. Two left shoes of the same size do not form a complete pair; record pending sides when the process handles individual pieces before matching.

Grupo ZAS publishes recipes and consumption by model, size and color alongside size-curve features. Footwear ERP features. This description helps compare coverage but does not prove any production total respects your curve. Ask for a case with enough overall quantity but a requested size missing.

Example: forty-eight pairs need a weighted sum

SizePairsm² per pairSubtotal m²
2480.181.44
25160.193.04
26160.203.20
2780.211.68
Total48By variant9.36

The reference is 8×0.18 + 16×0.19 + 16×0.20 + 8×0.21 = 9.36 m². An average ignoring the mix may produce a different requirement. If four size-24 pairs change to size 26 before release, the total remains forty-eight, but the reference rises by 0.08: subtract 0.72 and add 0.80, reaching 9.44 m². Retain revision and authorization; do not silently change a run whose material has already been cut.

Does a pattern calculation equal actual consumption?

INESCOP publishes size grading and material calculation methods in Icad Discovery along with manufacturing documentation. Grading and consumption. Select the relevant method for leather, synthetic or another form and retain its reference. A design result and actual warehouse issue are different records. Verify which file or interface transfers model, size, unit and revision; a CAD logo does not establish integration.

For the original M48 run, 11 m² are issued and 0.60 return unused: net consumption is 10.40. Against the 9.36 standard, the difference is 1.04 m². That does not establish waste by itself: it may include pending remnants, setup, material defects or an incorrect entry. Classify destinations and use a consistent unit. Do not add linear meters, area and piece counts without explicit relationships.

What does a partial delivery demonstrate?

An initial twenty-four pairs with sizes 24/25/26/27 in quantities 4/8/8/4 leaves 4/8/8/4 pending. If all twenty-four were size 25, the overall partial quantity would not show the mix is correct. Retain progress by stage and accepted quantity by variant; completed cutting is not a finished pair or delivered order. Incompatible sides or colors remain held for review.

Business Central documents materials versions with validity dates. Recipe versions. This is a configuration-dependent product reference. A policy preserving an already released footwear recipe needs testing; it does not imply Nightly has implemented CAD, grading or that control in a factory.

Which tests must pass by variant?

  • Normal: M48 retains 8/16/16/8 and calculates 9.36 m² with its revision; partial delivery leaves size-specific pending quantities.
  • Exception: a correct total with the wrong size or color cannot appear as a fully accepted run.
  • Units: pairs and individual shoes remain distinct; an incompatible match cannot be released.
  • Material: 11 issued minus 0.60 returned gives 10.40 net, with the 1.04 difference awaiting explanation.
  • Retry: repeating closure F24 neither adds another twenty-four pairs nor consumes their material again.

What should you bring to a diagnosis?

Complete the size-run and material worksheet. Materials revisions cover recipe changes; scrap accounting explains material destinations. To scope footwear manufacturing software, bring a real size run, partial delivery and warehouse consumption. The discussion starts with verifiable quantities and the process that needs connecting.

Bring a size run and its material issue

In a free diagnosis we can review where the relationship between size, recipe, progress and consumption is lost.

  • An order by model, color and size with pair quantities.
  • The size-specific recipe or consumption report and revision.
  • A partial delivery and material movements with unused returns.
Book a free consultationAsk on WhatsApp

Related

Frequently asked questions

No. Required sizes and colors must match. A correct total can conceal an excess of one variant and shortage of another.

Only if your technical criterion supports it and it is identified as such. The example uses different standards and calculates a weighted sum by run.

It is a difference to investigate. Classify remnants, losses, setup and errors before assigning a cause or disposition.

Only when they meet defined matching rules: compatible sides, size, model and color. The system must distinguish individual pieces from accepted pairs.

Sources

  1. Icad Discovery: size grading and material calculationsINESCOP Solutions / Icad
  2. Footwear ERP: size curves and materialsGrupo ZAS
  3. Production bill of materials versionsMicrosoft Learn

Last updated:

Keep reading

Free consultation

Has your business outgrown Excel?

Tell us how your team works. In one call we’ll tell you what to fix first. We reply the same business day.

Just need a website? See packages from $10,000 MXN, VAT included

  • Free, no commitment
  • Proposal in 1 business day
  • Delivered in stages