**Short answer**

Define the run by model, color and size, calculating materials from the recipe for each variant. Record pairs and individual pieces with explicit units; check progress and remaining quantities by size. Treat net material use versus standard as a difference to investigate, rather than labeling every mismatch scrap or duplicating pairs when closure is retried.

## Size run, pairs and net material use

Ten tests of variant mix, weighted use, revision, partial delivery and unduplicated pairs.

[Download CSV worksheet](<https://nightlysoftware.com/plantillas/calzado-corridas-tallas-consumos-en.csv>)

In this guide

-   [What identifies the size run you must deliver?](<https://nightlysoftware.com/en/blog/footwear-size-runs-materials#footwear-curve>)
-   [Example: forty-eight pairs need a weighted sum](<https://nightlysoftware.com/en/blog/footwear-size-runs-materials#run-example>)
-   [Does a pattern calculation equal actual consumption?](<https://nightlysoftware.com/en/blog/footwear-size-runs-materials#pattern-consumption>)
-   [What does a partial delivery demonstrate?](<https://nightlysoftware.com/en/blog/footwear-size-runs-materials#size-progress>)
-   [Which tests must pass by variant?](<https://nightlysoftware.com/en/blog/footwear-size-runs-materials#footwear-tests>)
-   [What should you bring to a diagnosis?](<https://nightlysoftware.com/en/blog/footwear-size-runs-materials#prepare-run>)

## What identifies the size run you must deliver?

Relate order, model, color, sizing system and pair quantity by variant. Numbering needs a catalog: do not assume equivalence between different systems' labels. Distinguish pair, individual shoe, component and box. Two left shoes of the same size do not form a complete pair; record pending sides when the process handles individual pieces before matching.

Grupo ZAS publishes recipes and consumption by model, size and color alongside size-curve features. [Footwear ERP features](<https://grupozas.com/erp-calzado/>). This description helps compare coverage but does not prove any production total respects your curve. Ask for a case with enough overall quantity but a requested size missing.

## Example: forty-eight pairs need a weighted sum

**Synthetic model M48**

One model and color require 48 pairs. Sizes are local exercise labels, not an international conversion. Consumption in m² per pair is an illustrative standard, not measured cutting yield.

| Size |Pairs |m² per pair |Subtotal m² |
| --- | --- | --- | --- |
| 24 |8 |0.18 |1.44 |
| 25 |16 |0.19 |3.04 |
| 26 |16 |0.20 |3.20 |
| 27 |8 |0.21 |1.68 |
| Total |48 |By variant |9.36 |

The reference is 8×0.18 + 16×0.19 + 16×0.20 + 8×0.21 = 9.36 m². An average ignoring the mix may produce a different requirement. If four size-24 pairs change to size 26 before release, the total remains forty-eight, but the reference rises by 0.08: subtract 0.72 and add 0.80, reaching 9.44 m². Retain revision and authorization; do not silently change a run whose material has already been cut.

## Does a pattern calculation equal actual consumption?

INESCOP publishes size grading and material calculation methods in Icad Discovery along with manufacturing documentation. [Grading and consumption](<https://icad.inescopsolutions.com/es/icad-discovery/>). Select the relevant method for leather, synthetic or another form and retain its reference. A design result and actual warehouse issue are different records. Verify which file or interface transfers model, size, unit and revision; a CAD logo does not establish integration.

For the original M48 run, 11 m² are issued and 0.60 return unused: net consumption is 10.40. Against the 9.36 standard, the difference is 1.04 m². That does not establish waste by itself: it may include pending remnants, setup, material defects or an incorrect entry. Classify destinations and use a consistent unit. Do not add linear meters, area and piece counts without explicit relationships.

## What does a partial delivery demonstrate?

An initial twenty-four pairs with sizes 24/25/26/27 in quantities 4/8/8/4 leaves 4/8/8/4 pending. If all twenty-four were size 25, the overall partial quantity would not show the mix is correct. Retain progress by stage and accepted quantity by variant; completed cutting is not a finished pair or delivered order. Incompatible sides or colors remain held for review.

Business Central documents materials versions with validity dates. [Recipe versions](<https://learn.microsoft.com/es-mx/dynamics365/business-central/production-how-to-create-production-boms>). This is a configuration-dependent product reference. A policy preserving an already released footwear recipe needs testing; it does not imply Nightly has implemented CAD, grading or that control in a factory.

## Which tests must pass by variant?

-   Normal: M48 retains 8/16/16/8 and calculates 9.36 m² with its revision; partial delivery leaves size-specific pending quantities.
-   Exception: a correct total with the wrong size or color cannot appear as a fully accepted run.
-   Units: pairs and individual shoes remain distinct; an incompatible match cannot be released.
-   Material: 11 issued minus 0.60 returned gives 10.40 net, with the 1.04 difference awaiting explanation.
-   Retry: repeating closure F24 neither adds another twenty-four pairs nor consumes their material again.

## What should you bring to a diagnosis?

Complete the [size-run and material worksheet](<https://nightlysoftware.com/plantillas/calzado-corridas-tallas-consumos-en.csv>). [Materials revisions](<https://nightlysoftware.com/en/blog/bill-of-materials-revisions>) cover recipe changes; [scrap accounting](<https://nightlysoftware.com/en/blog/production-scrap-accounting>) explains material destinations. To scope [footwear manufacturing software](<https://nightlysoftware.com/en/solutions/footwear-manufacturing-software>), bring a real size run, partial delivery and warehouse consumption. The discussion starts with verifiable quantities and the process that needs connecting.

## Bring a size run and its material issue

In a free diagnosis we can review where the relationship between size, recipe, progress and consumption is lost.

-   An order by model, color and size with pair quantities.
-   The size-specific recipe or consumption report and revision.
-   A partial delivery and material movements with unused returns.

[Book a free consultation](<https://nightlysoftware.com/en/book>)[Ask on WhatsApp](<https://wa.me/524622212236?text=I%20want%20to%20review%20footwear%20size%20runs%20and%20consumption%20by%20size.%20I%20have%20an%20order%2C%20its%20recipe%20and%20a%20partial%20delivery.>)

Related

-   [Footwear manufacturing software](<https://nightlysoftware.com/en/solutions/footwear-manufacturing-software>)
-   [Production control](<https://nightlysoftware.com/en/solutions/production-control-software>)

## Frequently asked questions

### Is tracking total order pairs enough? 

No. Required sizes and colors must match. A correct total can conceal an excess of one variant and shortage of another.

### Can I use average consumption for every size? 

Only if your technical criterion supports it and it is identified as such. The example uses different standards and calculates a weighted sum by run.

### Is the difference between standard and net use scrap? 

It is a difference to investigate. Classify remnants, losses, setup and errors before assigning a cause or disposition.

### Do two shoes count as a pair? 

Only when they meet defined matching rules: compatible sides, size, model and color. The system must distinguish individual pieces from accepted pairs.

## Sources

1.  [Icad Discovery: size grading and material calculations](<https://icad.inescopsolutions.com/es/icad-discovery/>)INESCOP Solutions / Icad 
2.  [Footwear ERP: size curves and materials](<https://grupozas.com/erp-calzado/>)Grupo ZAS 
3.  [Production bill of materials versions](<https://learn.microsoft.com/es-mx/dynamics365/business-central/production-how-to-create-production-boms>)Microsoft Learn 

Last updated: October 8, 2026

## Keep reading

[ProductionOct 8, 2026

### Bill of materials: revisions that preserve work already underway](<https://nightlysoftware.com/en/blog/bill-of-materials-revisions>)[ProductionOct 8, 2026

### Production scrap: consumption, loss and recoverable material](<https://nightlysoftware.com/en/blog/production-scrap-accounting>)[ProductionOct 8, 2026

### Production scheduling: dates that respect available capacity](<https://nightlysoftware.com/en/blog/production-capacity-scheduling>)

---

Canonical: https://nightlysoftware.com/en/blog/footwear-size-runs-materials

Updated: 2026-10-08

Description: Test pairs by size and color, weighted material use, partial results and unused returns without hiding shortages behind the total.